Posts Tagged "instructions"

Erde waterproof high-cover fitting instructions

Erde waterproof high-covers are quite simple to install. Here is a set of fitting instructions to help simplify it further. First of all you should remember that the 102, 122 and 142 are slightly different to the rest of the Erde range. The 143 model trailer and above have black plastic caps covering holes in […]

Back to Top | Comments Off on Erde waterproof high-cover fitting instructions

Triple lock towing head fitting instructions

Here is a guide to replacing a standard coupling head with a ‘triple lock’ style coupling on a 50mm box section drawbar. Below is a triple lock head kit. This comes with all the nuts and bolts needed to fit it, but there are a few other things you will also need. You will need […]

Back to Top | Comments Off on Triple lock towing head fitting instructions

Erde 122 hard-top cover fitting instructions

Here is a guide to fitting a hard-top cover to an Erde 122 trailer. First you will need to reinforce the front body panel of your trailer. Take one of the reinforcement plates supplied with the cover, this will need to be slotted under the lip at the top of the front panel. There should […]

Back to Top | Comments Off on Erde 122 hard-top cover fitting instructions

Assembly instructions for an Erde 143 trailer

Assembly instructions for an Erde 143 trailer kit We find that some people have problems following the instructions Erde supply with their trailers. To make this easier we have put together our own illustrated instructions for assembling Erde trailers. Tools needed: 10mm spanner/socket. 13mm spanner/socket. 17mm spanner/socket. Flat-head screwdriver. Socket extension. Large punch. Hammer. Things […]

Back to Top | Comments Off on Assembly instructions for an Erde 143 trailer